ULTENIC D10 Robot Vacuum and Mop
ULTENIC D10 Robot Vacuum and Mop
Where To Buy
Where To Buy
Description
Description
ULTENIC D10 highlights
Smarter, Faster & More Precise
with an upgraded chip and laser, it maps in 15 minutes and supports 5 map switches. Compared to older models, lidar navigation is more accurate, cleaning is more thorough, and paths are more efficient, solving issues of missed spots, repeated cleaning, and docking difficulties.
Deep Cleaning & Long Lifespan
The D10 features a brushless motor, offering powerful suction of up to 4000Pa across its 3 modes. This makes it perfect for effortlessly collecting various types of debris from both floors and carpets. With a runtime of up to 120 minutes, it efficiently cleans your entire home without the need for frequent recharging.
True Breakpoint Continuous Cleaning
It automatically returns to the charging dock when the battery is low and resumes cleaning once the battery reaches 85%, Lidar navigation ensures no areas are missed or repetitively cleaned.
Remote Controlled by Siri/Alexa/Google/APP
With the Ultenic app, you can easily monitor the cleaning route, set cleaning schedules, adjust suction power and water levels, change cleaning modes, and create no-go zones. You can also conveniently control the on/off and operation modes of the machine using voice commands.
Allergy-friendly & Highest HEPA Filtration
It adopts a 5-cone detachable filter system, including an H12-grade HEPA filter, effectively trapping 99% of dust and avoiding secondary air pollution.
Carpet Auto-Boost
D10 is equipped with ground detection sensors that automatically increase suction power up to 4000Pa when detecting carpets. It also features anti-slip wheels and a brush roll design that effectively prevents tangling with cords. This makes it suitable for various floor types including hardwood, tiles, carpet, and more.
Specifications
Specifications
| General | |
|---|---|
| Brand | Ultenic |
| Type | Robot Vacuum and Mop |
| Model | D10 |
| Color | Black |
| Specification | |
| Max Suction Power | 4000pa |
| Max Running Time | 120 mins |
| Navigation | Laser Navigation/LDS |
| Obstacle Avoidance | AI Obstacle Avoidance |
| Self-emptying Dock | No |
| Vacuum and Mop 2-in-1 | Yes |
| Siri Control | Yes |
| Remote/APP/Alexa/Google | Yes |
| Carpet auto-boost | Yes |
| No-go Zone | Yes |
| Breakpoint Continuous Cleaning | Yes |
| Weight & Size | |
| Product Weight | 2.8kg |
| Package Weight | 4.2kg |
| Product Size(L x W x H) | 32x32x9.7cm |
| Package Size(L x W x H) | 43x37x13cm |
| Package Contents | |
| 1 x D10 Robot Vacuum | |
| 1 x Charging Station | |
| 1 x Charger | |
| 2 x HEPA | |
| 2 x Side Brush | |
| 2 x Mop | |
| 1 x Cleaning Tool | |
| 1 x User Manual | |
| 1 x App Guide | |
*Price, description, package content and images are informative only, please check for details on website of concrete seller!
Share
